Framing
A gallery of images


First Floor
The first floor of the house being framed from the back view
Looking over the plans with Manuel
There was a 5.5" discrepancy between the foundation plans and the foundation.
Crawl Space during Framing Stage
The Crawl space is the area behind the retaining wall of the house. Eventually, it will contain the mechanical innards of the house.
Starting the Framing of the Top Level
Roofer on Edge of Roof
Roofer putting the finishing touches on the underlayment
House with Roof and Windows
Framing completed with roof, siding, windows and exterior doors.

Copyright © 1998 MicroAssist, Inc. All Rights Reserved.
Site developed by MicroAssist. Please read the disclaimer before using this site.